TÂN VŨ_ LẠCH HUYỆN BRIDGE
Tan Vu_ Lach Huyen bridge
has total length of 15,6 km.and long sea crossing 5,44km.the bridge width is 16meter with 4 lanes.The bridge construction project is approved on 29 octocber 2010. And starting construction 15 february 2014 issued by Prime Minister Nguyen Tan Dung. The Tan Vu_Lach Huyen inaugurated on 2 september 2017 with a total cost of 11850 billion VND.
Completion of the Bridge with Lach Huyen Port,Dinh Vu industrial zone with the area east of the Hai Phong City connected to the highway Hai Phong_Hanoi.
Help for Hai phong city economic develop in future.As well As help develop tourism in Cat Ba island_ Hai phong City.